Lockout/Tagout and Electrical Safety
Table of Contents
| Purpose | ||
| Exceptions | ||
| Definitions | ||
| Responsibility | ||
| Training | ||
| Personal Protective Equipment | ||
| Lockout/Tagout Devices | ||
| Lockout/Tagout Procedure | ||
| Testing Procedures and Equipment | ||
| Boundaries | ||
| Equipment Specific Procedures | ||
| Procedure Involving More than One Authorized Employee | ||
| Discipline | ||
| New or Modified Equipment | ||
| Outside Contractors | ||
| Periodic Inspection | ||
| Appendices | ||
| Appendix A: Table 130.7(C)(10) | ||
| Appendix B: Table 130.2(C) | ||
| Appendix C: Table 103.3(A) |